Southern West Virginia

Excavation & Dirt Work

Gravel roads, driveways, grading, drainage prep, and dirt work for access and property improvements.

Excavation & Dirt Work - Skidrig
What It Is

Shape the ground right

Good dirt work is the foundation of almost every outdoor project. We grade, cut, fill, and shape the ground for access, drainage, and a solid base for what gets built on top of it.

Whether you need a driveway that holds up, water moved away from a building, or a pad leveled, we move the dirt to make it work.

What We Do

What we handle

Gravel roads & driveways

Cut, fabric, road base, finish gravel, and crown — built to shed water and hold up to use.

Drainage prep

Shape and grade the ground to move water away from buildings and low spots.

Grading & leveling

Level pads, yards, and work areas to the grade the project needs.

Cleanup & haul

Clear, cut, and haul material as part of getting the site right.

Gravel Roads

How we install a gravel road

A lasting gravel road is more than rock dumped on dirt. We cut the subgrade, separate it with geotextile fabric, build a compacted base, then finish with crushed gravel and a crown so water runs off both sides instead of pooling in the middle.

Cutaway diagram of a Skidrig gravel road: finish gravel, compacted road base, geotextile fabric, and compacted subgrade with crown drainage
Example build-up for a 415′ × 12′ gravel road — layers from finish surface down to compacted subgrade.
  1. Cut & compact the subgrade

    Excavate about 8″ below finished grade and compact the existing soil so the road has a solid foundation.

  2. Lay geotextile fabric

    Fabric separates road base from the soil, stops mixing, and improves long-term stability.

  3. Place & compact road base

    About 6″ of crushed stone / road base, compacted for structural support and load distribution.

  4. Finish gravel & crown

    About 2″ of 3/4″ minus crushed stone for the driving surface, crowned 2–4% (¼″–½″ per foot) so water sheds both sides.

Proper crown and drainage keep the road from washing out. Without it, water sits in the middle and softens the base.

Example quantities for a 415′ × 12′ road: excavation ~123 yd³ · geotextile ~5,300–5,600 sq ft · road base ~92 yd³ · finish gravel ~31 yd³. Your site may differ — send length, width, and photos for a real quote.

Why Skidrig

Why property owners call us

Right equipment

We bring the machines and gear to do the job safely instead of forcing it.

Straight communication

You will know the plan, the timeline, and what to expect. No runaround.

Local & accountable

Based near Wayside, WV and focused on Southern West Virginia.

Real follow-through

We finish the job and leave the site clean and right.

FAQ

Common questions

Do you build gravel roads and driveways?

Yes. We excavate the subgrade, install geotextile fabric, place and compact road base, then finish with crushed gravel and a proper crown so water sheds off both sides. Tell us the length and ground and we will scope it.

Can you fix drainage problems?

We grade and shape the ground to move water where it should go. Show us the problem area and we will plan it.

Do you do small jobs?

Yes, from a single pad or driveway to larger site work. We size the equipment to the job.

Need excavation & dirt work?

Call, text photos, or send a quick message. We will get you a real quote.